Navarre Beach Wastewater Treatment Facility Upgrade Project
 

Project Summary

Constantine Engineering Staff Served as Project Manager and Consultant for the Navarre Beach WWTF Upgrade Project:

  • Conversion of Barrier Oxidation Ditch to an Advanced 5-stage Biological Nutrient Removal Process
  • New Blowers and Fine Bubble Diffusers
  • Submersible Banana Blade Mixers
  • Full Process Automation
  • Complete Overhaul of Plant Electrical System from 240 V to 480 V
  • Replacement of all plant pumps
  • New electrical building and MCC
  • VFDs on all pumps and blowers
  • A New Plant Generator. New Bio-solids Building and Belt Press

 

Navarre Beach Wastewater Treatment Facility Upgrade Project
Navarre, FL

Constantine Engineering Staff served as Project Manager and Consultant for the Navarre Beach Wastewater Treatment Facility Upgrade Project, Navarre Beach, Florida. The facility was last upgraded in 1982, and in 2004 the Utility initiated a program to upgrade the wastewater treatment facility.

The goals of the project were to convert the barrier oxidation ditch to a 5-stage biological nutrient removal process; improve reliability; convert the electrical system from 240V to 480V; replace all pumps with variable speed drives to address surge flows; construct a new electrical and generator building; replace a clarifier that had been destroyed during a recent hurricane; and construct a new bio-solids building and belt filter press.

The converted process design and construction were completed in 2007 and the client is extremely satisfied with the performance of the modified facility. Prior to the upgrade, effluent quality was less than 5 mg/L for both 5-day biochemical oxygen demand (CBOD5) and total suspended solids (TSS), 9 mg/L total nitrogen and 3 mg/L total phosphorus. The modified facility is removing nitrogen to less than 3 mg/L and phosphorus to less than 1 mg/L and qualifies for the Florida’s Advance Wastewater Treatment (AWT) and EPA’s Class I Reliability classifications.

An unexpected benefit of the improvements and modifications has been a significant improvement in the removal of copper from the effluent. The Utility has been under an administrative order for failure to remove copper to below the state standard of 3.7 ug/L. Presently, the facility is in full compliance with these limits; the first time in 8 years.

Printable PDF

  The Constantine Group on LinkedIn The Constantine Group, Inc. ~ Constantine Engineering, Inc., Constantine Management, Inc., and Constantine Constructors, LLC
Home | Overview | Engineering | Management | Construction | Careers | Contact Us | Privacy | Terms | Site Map |
© Copyright All Rights Reserved | Team Login

.